Typical Production cycle in Process Industry

...Previous

Here give the short text, field search and int. char.desc as pH and select the Quantitative check box.

 

pH have some ranges so, we have to select the limits are upper and lower spec limits.

The same way we have to create temperature also

5.       Now create the Quality plan using QP01

Now we are planning to create the quality plans which are to be tested before release from QC

Header data details as above

Then Go to operations and give control key as QM01, select the line item and go to inspection description tab.

Enter the MIC details here. While entering system will ask the upper spec and lower spec limits. Enter limits and save

Masters are ready to proceed the Production Cycle  

We will start Production Cycle using transactions

1.       Create Process Order using COR1

Here give the total quantity as “50” and enter the start date, system will check the scheduling and capacity planning and finally finish date will come.

Now, once the process is over check the master data, in that we can find the created recipe group for that material “FG 1”

Now the PO stated us “Created”

Press the Flag button and ‘Release” the PO for production. After pressing flag button, actually system will checks material availability, scheduling, capacity planning etc., Once it is over the status of the PO will be changed to “Released mode”  

Save the Process order.

Click here to continue...

 Please send us your feedback/suggestions at webmaster@SAPFunctional.COM 

HomeContribute About Us Privacy Terms Of Use • Disclaimer • SafeCompanies: Advertise on SAPFunctional.COM | Post JobContact Us  

Graphic Design by Round the Bend Wizards

footer image footer image