Typical Production cycle in Process Industry...Previous Here give the short text, field search and int. char.desc as pH and
select the Quantitative check box.
pH have some ranges so, we have to select the limits are upper and lower
spec limits. The same way we have to create temperature also 5.
Now
create the Quality plan using QP01
Now
we are planning to create the quality plans which are to be tested before
release from QC Header
data details as above Then
Go to operations and give control key as QM01, select the line item and go to
inspection description tab.
Enter
the MIC details here. While entering system will ask the upper spec and lower
spec limits. Enter limits and save
Masters are ready to proceed the
Production Cycle We
will start Production Cycle using transactions 1.
Create
Process Order using COR1
Here give the total quantity as “50” and enter the start date, system
will check the scheduling and capacity planning and finally finish date will
come.
Now, once the process is over check the master data, in that we can find
the created recipe group for that material “FG 1”
Now the PO stated us “Created”
Press the Flag button and ‘Release” the
PO for production. After pressing flag button, actually system will checks
material availability, scheduling, capacity planning etc., Once it is over the
status of the PO will be changed to “Released mode”
Save the Process order.
|
|
|
Please send us your feedback/suggestions at webmaster@SAPFunctional.COM Home • Contribute • About Us • Privacy • Terms Of Use • Disclaimer • Safe • Companies: Advertise on SAPFunctional.COM | Post Job • Contact Us ©2006-2007 SAPFunctional.COM. All rights reserved. All
product names are trademarks of their respective companies. SAPFunctional.COM,
Inc. is in no way affiliated with SAP AG. Graphic Design by Round the Bend Wizards |
||