| Home • Forums • Interview Q's • Jobs • Testimonials • Contact Us | ||
Topics:General TopicsEmail a FriendContribute |
Concepts of Central Person and Steps to follow in Case if all the Personnel Assignments for a Personnel Number are not shown in PA30By Vijay Sundaresan, Tata Consultancy Services Before
going into a specific issue, let’s see what a Central Person is. CP
(Central Person) is an object type which is linked via a relationship to object
type P (Person). CP object is created in background while hiring a person
(necessary configuration should be in place). CP is mainly required when there
are multiple countries implemented in a system and an Employee needs to be
re-assigned to a country other than Home country. In that case a new PERNR is
generated for this employee for the new Country and this PERNR is again linked
to the same CP object. Thus all the various PERNRs of Employee are liked to the
same CP which uniquely identifies the Employee. CP->PERNR1
(Object type P) CP->PERNR2
(Object type P) CP->PERNR3
(Object type P) CP->PERNR4
(Object type P) This helps
in tracking the Employee with different PERNRs in different countries with the a
unique Central Person ID (CP). SCENARIO: In PA30,
Below is the screen where the Pers Assgn at the top has only one assignment in
Yellow.
The
related Personnel number 3364 is shown below with Pers Assgn as Blank.
Ideally
the above two personnel numbers refers to one and the same Person due to the
different Personnel Assignments. (like expatriate). But the Personnel
Assignments in the system shows just one instead of two. This is
because that the Central Person ID 00000227 is linked only to Personnel Number
00003369 and not to the related Personnel number 00003364 as it is below.
Now the
above two Personnel Number 3364 and 3369 has to be linked to the same Central
Person ID so that there can be two different Personnel Assignments. When you
try to create a link between the Central Person and the Personnel Number
directly in PP01, you will get the below error. Relationship CP B 209 P cannot be maintained using
basic transaction
This can
not be maintained through the basic transaction PP01. To
maintain this through Basic Transaction, following settings has to be done. Go to SM30
and the table is T777E
Select the
relationship 209 and GOTO Allowed Relationship in left
In the
below screen, if both the Top Down and Bottom Up relationships are checked
(enabled) for NOT MAINTAINED field, then it will not allow to maintain in
the basic transaction PP01.
|
|
|
Please send us your feedback/suggestions at webmaster@SAPFunctional.COM Home • Contribute • About Us • Privacy • Terms Of Use • Disclaimer • Safe • Companies: Advertise on SAPFunctional.COM | Post Job • Contact Us ©2006-2007 SAPFunctional.COM. All rights reserved. All
product names are trademarks of their respective companies. SAPFunctional.COM,
Inc. is in no way affiliated with SAP AG. Graphic Design by Round the Bend Wizards |
||